Construction of the Mandurah Line.


1
Waikiki Station before tracks laid June 2006

2
Mandurah Railway Line, 2 May 06

3
Mandurah Railway Track layer, 2 May 06

4
Mandurah Railway track laying team, 2 May 06

5
SSRS's R1902, on the sleeper train, 2 May 06

Thanks to Graeme Tingey, for these photos of the Mandurah Railway Line.

Back to the main page